one) Regeneration fuel: a mixture of hydrogen and inert gas (hydrogen accounts for five% -ten%)

2) Quantity: innovative technology glovebox 40L gas cylinder 10Mpa

three) Regenerative fuel stress: .05Mpa (the gas use for every half hour in the condition of .05Mpa is that the cylinder pressure drops by one.5Mpa. If it exceeds one.5Mpa, the pressure of the strain regulator’s agenda will be decreased, if it is fewer than one.5Mpa Boost the force of the force regulator schedule)

4) System: 3 hours heating-3 hrs heating and air flow-3 hrs vacuuming-one hour pumping-10 hours cooling

five) Ways:

① Connect the regeneration fuel (examine the pipeline for leaks soon after link: immediately after connecting, open up the main valve of the pressure lowering valve to the greatest, open the auxiliary meter to .1Mpa, change off the primary valve, wait 15 minutes, if the tension of the auxiliary meter stays at .1 Mpa stays unchanged, indicating no air leakage

>②Set the force of the auxiliary gauge of the stress decreasing valve to .1Mpa (the tension during ventilation is about .06-.08MPa

>③ Shut the cycle and analyz

r>④Turn on the vacuum pu

r>⑤ Commence regenerat

br>⑥ The new software finishes at 20h (clean just before cleaning, water and oxygen index <200p


6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 ho


7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.